Apologies for the lack of communication for the last few months, but there has been little of importance to pass on as news, but we do now have some news of works planned for this year (items previously discussed at the AGM last year for lessees of Bourns Court).

We now have the two new directors on board, Paul and Lewis, joining Nicole, Joe and Andrew.  All directors are resident at Bourns Court and represent a healthy 25% of the 20 flats.

§  Paths and drainage

Quotes have now been received for works to put new drainage and paving for both the paved paths at the front and back of the building. The drain at the back of the building has been particularly problematic of late, so the first stage will be to deal with the drainage problems and replace the old concrete paving slabs. To minimise disruption, the work to the front path will be done at a later date.

§  Interior redecoration

The redecoration of the communal areas was put on hold pending the planning application to replace the grilles above the windows with double glazed panels. The application was granted in December, so this redecoration work should commence soon. The removal of the grilles will hopefully prevent damage to the ceilings.  The ceilings will now be repaired as part of the redecoration of the common parts.  Quotes are being received at the moment for this work and will be considered and circulated to lessees.

§  Replacement fire doors

There will be an option for anyone who wants to upgrade their front fire door to replace it with a plain door which will be painted to match all the others (this upgrade being voluntary, the cost of this will be met by each individual lessee who requests this additional work).  All doors will be of a uniform coloured paint finish.

§  Tree surgery

Unfortunately, the tall poplar by the garages and the public footpath between the two lakes is dangerously infected with Honey Fungus and needs removal.  Quotes are being sought to carry out this work, and other tree maintenance work, together with the removal of ivy from trees in the grounds.

§  Moss

Malins have been requested to look to remove the moss on the garage roofs and in the drying area.

 

Kind regards,

Andrew, Joe, Lewis, Nicole and Paul