Flat Chat – Autumn 2013
| WELCOME to this Autumn issue of Flat-Chat – a quarterly newsletter designed to keep everyone informed as to what is currently going on in Bourns Court and also future plans your Directors have in the pipe-line.
The flats are now well over forty years old and in need of increased maintenance which means that we must retain a healthy reserve fund in order to cope with any unforeseen emergencies. That said, we are mindful that we should keep expenditure within bounds and achieving value for money will be our first priority.
Bourns Court Freehold Limited
We would like to thank Andrew Champion (Flat 19) for offering to join Nicole Speller (Flat 18) and Jean-Francois Dufour (Flat 12) as a director. After independent nomination and seconding, we officially welcome him this month to the Board. He brings a wealth of experience having lived in Bourns Court for a number of years and being a former Board Chairman. The directors believe his appointment will bring balance to the decision making process of the Board.
The trial appointment of our managing agent, Courtney Green, continues until the end of the year and we hope you will agree that there have been a great number of achievements in a relatively short space of time. We would like to extend our thanks to Sarah Cornelius and we look forward to a long-term working relationship with one of Horsham’s leading estate and managing agents.
The accounts for the year ended 31 December 2012 have been approved and filed with Companies House. Copies are available on request.
Works completed or in progress since June 2013 AGM
2. Ad-hoc repairs to the rear steps, pathway and drain surrounds have been completed but there are signs that the cement will need re-pointing in the not too distant future.
3. Entrance doors – keypad / fob entrance system. The keypad for emergency service access has been fitted to the wall adjoining the front door and a similar pad will be fitted to the rear entrance. Shortly each flat will be issued with two key fobs which will work on either pad. We have also decided to install ‘push to exit’ buttons which should help alleviate some of the problems encountered by some residents with the current facilities.
4. Fire safety. The latest regulations demand that the cables housed in the ‘void’ running up the building be fire-proofed. In order to gain easy access, we consider the best way to deal with the problem is to replace the existing landing panels (positioned between each front door) with fire-proof doors – which will be painted the same colour as the walls.
5. Front entrance flower pot. Our sincere thanks to Pip Davie (Flat 7) for providing the welcoming floral arrangement – a great improvement to our frontage!
6. Child nuisance. Ayshe Court Drive is now the pathway for parents and their children attending the two primary schools located off Harwood Road. And supervision of youngsters is not always as strict as one would wish – allowing them to swing on trees, trample over our lawns – and even climb on garage roofs. With this in mind, our managing agent, Sarah Cornelius, has written to the head teacher of both schools requesting greater supervision.
In the pipe-line
2. Garages. We hope to clear the moss on the garage roofs in the near future and possibly paint the garage doors and surrounds in due course – implementing the agreed colour scheme – dark blue doors with white surrounds. With the improved drying area, the rear of the flats should have a much more welcoming appearance.
3. Wheelie bins. Inevitably, the bins get messy over time and consideration is being given to having them cleaned periodically. It would be appreciated if all residents could please ensure that they use the appropriate bin for their waste and do not clutter them with large items which can be taken to the Hop Oast tip for disposal. Also please treat them with care as we have to pay for replacement bins.
4. Balconies. It is intended to re-paint the balconies – possibly early next year. This may require that the railings are stripped to bare metal and treated for rust prevention. Oil based Hammerite paint will be used for the final top coat.
5. Building survey. Bearing in mind the age of the building, it has been decided to commission a full building survey in order to ascertain the state of the roof and other vulnerable parts of the building. Here it is worth noting that the entire roof had to be replaced following the memorable storm of 1987 – which entailed obtaining relatively unskilled labour at very short notice.
6. Japanese Knotweed (Fallopia japonica) is invading our patch and could in time threaten the stability of some of the garage walls. The weed has recently been described in the media as being, ‘the most invasive species of plant in Britain’ which grows at an unprecedented rate of knots! With this in mind, we have instructed a specialist contractor to help us and our gardeners to keep this under control.
Footnote
Contributions to Flat-Chat are always welcome. Also, if you have a concern regarding the flats that you would like to share with other residents, please have a word with one of us – we are here to listen!
Andrew, Jean-Francois and Nicole |
